ASSIGNMENT #2
Due: February 28, 1130 hrs
Work in groups of TWO from within your own set.
Part A.
(1). An electric pump circulates water through the radiators of a central heating system. The
pump will have a signal input which must be set to a high state when the pump is to be
turned on. This pump should operate only when a time switch is on (high) and the room
temperature is below a pre-selected level (this will be indicated by a thermostat being in a
high state). There are a total of two rooms each with their own thermostat and the pump
should be on if either of the thermostats is on.
Design a a circuit that will operate the pump based on the criteria above using
combinational circuits . Provide a truth table and your circuit design.
Part B
(1). Solve and hand in the following problems from your textbook :
Chapter 3: 1, 2, 3, 4, 5, 6, 7, 8, 10, 12, 15, 16, 18, 21, 22, 23, 24